S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 625 | 4.4 | 2750 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 100 | 0.3 | 30 |
3 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 39.94 | 882 | 35227.08 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 74.2 | 177 | 13133.4 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.58 | 2504 | 3956.32 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 2.23 | 2202.9 | 4912.467 |
7 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 19.5 | 3307.4 | 64494.3 |
8 | False work for R.C.C. and P.C.C. work in plinth and foundation | 10.56 | 147.8 | 1560.768 |
9 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 370.09 | 1079 | 399327.11 |
10 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 10.54 | 1858.7 | 19590.698 |
11 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 100 | 59.1 | 5910 |
12 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 3912.3 | 44.6 | 174488.58 |
13 | Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing | 1278 | 68.2 | 87159.6 |
14 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 3000 | 41.31 | 123930 |
15 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 93.75 | 72.36 | 6783.75 |
16 | Loading of metal in truck, dumper etc. | 1000 | 42.93 | 42930 |
17 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 300 | 44.7 | 13410 |
18 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 483 | 33.2 | 16035.6 |
19 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1 | 28794.1 | 28794.1 |
20 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 199.69 | 96.2 | 19210.178 |
21 | Collection of soft moorum including stacking at quarry. | 210 | 142.5 | 29925 |
22 | Collection of hard moorum including stacking at quarry. | 293.75 | 142.5 | 41859.375 |
23 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 3484.365 | 52.7 | 183626.0355 |
24 | contingency | 1 | 39475.6385 | 39475.6385 |