State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RICHHARIKALAN(P)
Work Code: 1703004083/DP/22012034236838 (shantidham richharikala)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/1900 Work start date : 1/1/1900
Present status : NEW Proposed Status : AWC
Tech Sanction Details
Technical Sanction No. : 83/2337 Sanction Date : 4/11/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
741908 616612 0 0 0 0 0 617000 0 1358520
Financial Sanction Details
Financial\Administrative Sanction No: 83/03 Financial\Administrative Sanction Date 7/11/2016
Fin. Sanc. Amt. (in Rs) NREGA:1358520 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1359000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.6254.42750
2Dag-beling-Single spade stroke minimum 75mm deep1000.330
3Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.39.9488235227.08
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)74.217713133.4
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.5825043956.32
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)2.232202.94912.467
7Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used19.53307.464494.3
8False work for R.C.C. and P.C.C. work in plinth and foundation10.56147.81560.768
9Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.370.091079399327.11
10Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)10.541858.719590.698
11Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height10059.15910
12Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars3912.344.6174488.58
13Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing127868.287159.6
14Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.300041.31123930
15Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.93.7572.366783.75
16Loading of metal in truck, dumper etc.100042.9342930
17Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.30044.713410
18Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making48333.216035.6
19Site clearance, cutting grass, raking into heaps and removing off the premises128794.128794.1
20Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil199.6996.219210.178
21Collection of soft moorum including stacking at quarry.210142.529925
22Collection of hard moorum including stacking at quarry.293.75142.541859.375
23Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed3484.36552.7183626.0355
24contingency139475.638539475.6385
Total Activity 1359000
S.NoMaterialQuantityUnit PriceTotal
120 MM METAL20140028000
240 mm Metal6525716705
3Bricks5000420000
4CEMENT.380300114000
5Centering and Shuttering 42858004000
6Display board120002000
7DOOR10059.15910
8G.C.I. Sheet8064551600
9HumePipes51535.57677.5
10Iron angles, Trusses, wind tie4507031500
11Masonry Stone103753750
12moorum700101.3170917
13Paint On Steel Work202004000
14Roof fittings, nuts, bolts80745920
15Sal Bullah3484.362.79407.772
16sand6080048000
17Stainless steel hand rail13324.3783324.378
18Transportation charges93.7572.366783.75
19Transpotation Charges470325.78153116.6
20Water Saplay58004000
21सरीया5005226000
Total Material 617000