S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 2500 | 6.55 | 16375 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 79.09 | 1000.1 | 79097.909 |
3 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Hard moorum | 5005 | 21.79 | 109058.95 |
4 | Dag-beling-Single spade stroke minimum 75mm deep | 1 | 830 | 830 |
5 | Providing and laying in foundation, plinth and under floors lime concrete with 40mm nominal size graded stone aggregates (metal) and 40% lime mortar. i/c ramming in layers and curing complete excluding cost of form work.-Lime mortar 1:2 (1lime putty, 2sand) | 27.6 | 3202.63 | 88392.588 |
6 | Rough chisel dressed sand stone flooring over 20mm average thick base of cement mortar 1:5 (1cement, 5sand) with joints finished flush (Area of each stone should not be less than 0.20 Sqm.)-With 25 mm thick stone | 420 | 379 | 159180 |
7 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 15 | 53466.66 | 801999.9 |
8 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited) | 6.6 | 10010 | 66066 |