State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: BILANKHEDA
Work Code: 1725006013/IF/50 (कपिलधारा कूप सह मेढ बंधान कार्य कालूराम छितर (बिलन)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2010-2011 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 16/10/2010 Work start date : 26/10/2010
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 000566 Sanction Date : 25/10/2010
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
84000 47000 0 0 0 0 0 47000 0 131000
Financial Sanction Details
Financial\Administrative Sanction No: 000029 Financial\Administrative Sanction Date 26/10/2010
Fin. Sanc. Amt. (in Rs) NREGA:131000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
131000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil43.1934.41485.736
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil192.1938.27341.658
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)161006100
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead96.09151441.35
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)5.092445.312446.577
6False work for R.C.C. and P.C.C. work in plinth and foundation102125.112760.2
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars14346.36620.9
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil22.6761.71398.739
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum22.6780.21818.134
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)45.342192.858744.2047
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.168.3352.3259295.456
12work charge11100011000
Total Activity 131000
S.NoMaterialQuantityUnit PriceTotal
110 mm HG Chips140004000
220 M.M. METAL2.71761.52063.665
340 mm size HG metal120002000
4blasting142709940
5Board115001500
6BULLOCK CART3040012000
7Cement1290290
8Cement(bori)203056100
9Centering and Shuttering61.6990.65589.114
10deasil pump34001200
11Display board115001500
12photographs12020
13RR stone (Granite)18080
14Sand1.35565.35763.2225
15Sand (mortar)120002000
16STEEL128.4560.77796.915
17Transportation charges of material110121012
Total Material 57900