S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Work charge | 1 | 13595 | 13595 |
2 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 50m And lift upto1.5m-Loose or soft soil | 5600 | 1.1 | 6160 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 1600 | 0.3 | 480 |
4 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 486 | 81.4 | 39560.4 |
5 | Transportation of metal | 600 | 84.33 | 50598 |
6 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 486 | 177.93 | 86473.98 |
7 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 486 | 52.4 | 25466.4 |
8 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 3000 | 15 | 45000 |
9 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 3152 | 55.6 | 175251.2 |
10 | SIGN BOARD | 1 | 1000 | 1000 |
11 | Labour difference in case of old SoR | 1 | 54362 | 54362 |