State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: KHADAUA(P)
Work Code: 1703004016/WC/22012034507015 (PM AWASH HARVESTING SUNEEL /KARAN SIN GH )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2019 Work start date : 20/11/2019
Present status : Non-existent Proposed Status : Construction of Recharge Pits for Community
Tech Sanction Details
Technical Sanction No. : 4016/446 Sanction Date : 6/11/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Beneficiary Contribution scheme2 scheme3 Total
1565 3935 0 0 500 0 0 4500 0 6000
Financial Sanction Details
Financial\Administrative Sanction No: 4016/0024 Financial\Administrative Sanction Date 15/11/2019
Fin. Sanc. Amt. (in Rs) NREGA:5500 Beneficiary Contribution
500
Scheme 2
0
Scheme 3
0
Total
6000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil3.1792576.9244.484325
2Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 1 (Size ranging from 90 mm to 45 mm)0.7948160.5127.5654
3Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size1.8121375679.5375
4Transportation of sand2.5969394.951025.645655
5Labour only for boulder soling hand packed excluding consolidation.0.7948114.591.0046
6Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal, grade-1 As per MOST 2004 clause 400.2.5 including dressing.1.812144.781.00087
7contingency137513751
Total Activity 6000
S.NoMaterialQuantityUnit PriceTotal
1BOULDER CHECK2.5146365
2CONTENGENCY1700700
3P V C PIPE 2122853420
Total Material 4500