Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:01:11 AM 
Back  
State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: KORATA
Work Code: 1711006051/IF/9993702538 (kapil dhara koop dinesh/goray lal)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/11/2015 Work start date : 6/1/2016
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 364/6 Sanction Date : 28/12/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
200000 90000 0 0 0 0 0 90000 0 290000
Financial Sanction Details
Financial\Administrative Sanction No: 21/6 Financial\Administrative Sanction Date 31/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:290000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
290000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m1736.52736.52
3Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.59.31043.661885.48
4Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)5200510025
5TRANSPORTATION OF MATERIAL32100032000
6Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m3707.12627
7Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m2309.42162
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work10081.28120
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work15010816200
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work180353.263576
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum (CP/3/0.45)190477.290668
Total Activity 290000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL125002500
2Board120002000
3Cement(bori)150005000
4deasil pump135003500
5MASON (PERDAY)150005000
6Photocopy & staionary110001000
7Photograph1500500
8Pipe1500500
9Sand58004000
10Transpotation Charges12000020000
11पत्‍थर57.580046000
Total Material 90000