State: MADHYA PRADESH District: SATNA Block: UNCHAHARA Panchayat: PIPAROKHAR
Work Code: 1712004017/RC/45 (पीसीसी मार्ग मय नाली निर्माण कार्य शेर बहादुर के घ)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 13/8/2012 Work start date : 13/6/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 2012-13/164 Sanction Date : 13/9/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost VIDAYAK NIDHI scheme2 scheme3 Total
104000 69000 0 0 323000 0 0 392000 0 496000
Financial Sanction Details
Financial\Administrative Sanction No: 2013-13819 Financial\Administrative Sanction Date 9/10/2012
Fin. Sanc. Amt. (in Rs) NREGA:173000 VIDAYAK NIDHI
323000
Scheme 2
0
Scheme 3
0
Total
496000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Double spade "v" shaped stroke 100mm deep2600.4104
3Labour only for item no.040280.84302425.2
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)1152496.2287063
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)9.61927.718505.92
6Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used124.6323.840345.48
7False work for R.C.C. and P.C.C. work in plinth and foundation230112.125783
8Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)1165.8672.8
9Cement concrete [1:3:6] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete000
10Labour for spreading moorum and consolidation with HRR including watering including cost and conveyance of moorum000
11Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 80.846485.04
12Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 124.633.54174.1
13Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.27.5202.235561.325
14Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.106.39221.723586.663
15Transportation of sand54690.0337261.62
16Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.80.84148.2311982.9132
17Rigid and smooth centring and shuttering work including false work and dismantalled them after casting ( Mass concrete)000
18Contigency000
19Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete000
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work7567.85085
21Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil7073.85166
22Collection of hard moorum including stacking at quarry.80.84109.38835.812
23work charge1142.1268142.1268
24Labour difference in case of old SoR6802416320
25Earth work in excavation in Hard soil including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site.000
Total Activity 496000
S.NoMaterialQuantityUnit PriceTotal
140 M.M. METAL8.64785.16783.264
2CEMENT(BEGS)775250193750
3Centering and Shuttering23066.915387
4Display board115001500
5Mason (semi skilled)4525011250
6mixer machin (perday)125006000
7PhotoCopy & Stationary1125.801125.801
8SAND54772.2941703.66
9Vibrator50854250
10गिटटी 20 mm97.751138.1111249.275
Total Material 392000