The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:55:26 AM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: GADHOTA(P)
Work Code: 1703004021/RC/22012034596527 (Gravel Road Marammat karya Gadhota main road se nayagaon gadhota ki or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/8/2021 Work start date : 14/11/2021
Present status : Gravel Road Proposed Status : Repair & maint of Gravel Road Roads for Comm
Tech Sanction Details
Technical Sanction No. : 4021/522 Sanction Date : 18/8/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
495000 488000 0 0 0 0 0 488000 0 983000
Financial Sanction Details
Financial\Administrative Sanction No: 4021/452 Financial\Administrative Sanction Date 10/9/2021
Fin. Sanc. Amt. (in Rs) NREGA:983000 Public Contribution
0
Scheme 2
0
Scheme 3
0
Total
983000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Collection of approved soil having CBR not less then 12, including stacking at quarry.147.75185.3827389.895
2Transportation of metal 1122612.79122612.79
3Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.120089.93107916
4Providing single coat surface dressing with paving bitumen using 18kg. of bitumen 80/100 per 10 sqm with 0.15cum of stone chipping 13.2mm nominal size per 10 sqm of road surface for second coat and rolling complete with power roller exceeding 8 tonne.1577.23132.04208257.4492
5Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact344.7536.0712435.1325
6Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau517.25548.1283504.725
7Collection of soft moorum including stacking at quarry.1200184.07220884
Total Activity 983000
S.NoMaterialQuantityUnit PriceTotal
12043 soil Compaction material10036.043604
22048-Construction of gravel ba200540.86108172
32049-Construction of gravel surface course200540.86108172
4BAJARA1176352176352
5construcation of hard shoulder25012631500
6Display board150005000
7embankment with approved mater10012012000
8murrom10012612600
9R.C.C NP2 hume pipe dia 900mm2500010000
10Transportation Of Selected Soil10012612600
11water tanker108008000
Total Material 488000