S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 183 | 7.04 | 1288.32 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 164.7 | 156.79 | 25823.313 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 61 | 0.5 | 30.5 |
4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 686.25 | 114.56 | 78616.8 |
5 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 32.94 | 3202.91 | 105503.8554 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 15.86 | 3947.45 | 62606.557 |
7 | False work for R.C.C. and P.C.C. work in plinth and foundation | 3.05 | 174.2 | 531.31 |
8 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:4 (1cement, 4sand) | 204.96 | 2732.88 | 560131.0848 |
9 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 48.8 | 171.35 | 8361.88 |
10 | Stacking without boxing.-Masonry stones, pitching stones or boulders | 204.96 | 46.68 | 9567.5328 |
11 | Transportation of metal | 46.897 | 234.04 | 10975.77388 |
12 | Transportation rates for Masonry stone. | 204.96 | 506.24 | 103758.9504 |
13 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 97.481 | 226.38 | 22067.74878 |