S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 9.8 | 148.33 | 1453.634 |
2 | Cement Mortar 1:8 ( 1 cement, 8 sand ) | 2.18 | 1374.65 | 2996.737 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 2699.5 | 21.6 | 58309.2 |
4 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 271.3 | 14.6 | 3960.98 |
5 | Labour only for dressing stones hammer or rough dressed for C. R. masonry work second sort. | 109.18 | 40.32 | 4402.1376 |
6 | Transportation of metal | 9800 | 1 | 9800 |