State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SANKHNI(P)
Work Code: 1703004076/RC/22012034180942 (खरंजा निर्माण मुकेश कुशवाह के मकान से पुलिया की ओर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 5/9/2013
Present status : Kharanja(Brick/Stone) Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 76/138 Sanction Date : 10/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
348768 150474 0 0 0 0 0 151000 0 499242
Financial Sanction Details
Financial\Administrative Sanction No: 76/08 Financial\Administrative Sanction Date 12/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:499242 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep6760.2135.2
2Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.1216.8215.7262463.76
3Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.182.52507.6192648.9772
4Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.257.19151.9639082.5924
5Loading of metal in truck, dumper etc.257.1926.286758.9532
6Unloading of metal in truck, dumper etc.257.1913.143379.4766
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.257.194110544.79
8Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor257.1928.77381.353
9Collection of hard moorum including stacking at quarry.257.19130.833640.452
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.135212.817305.6
11contingency125900.845625900.8456
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
1Contengency and sign board118742.430418742.4304
2Transporation of Boulder182.52507.6192648.9772
3मुरम परिवहन (1)257.19151.9639082.5924
Total Material 151000