State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: BILANKHEDA
Work Code: 1725006013/IF/57 (कपिलधारा कूप निर्माण मेंढ बंधान भूनाडेप एवं वक्षार)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/5/2012 Work start date : 4/6/2012
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 0210 Sanction Date : 28/5/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
123000 82000 0 0 0 0 0 82000 0 205000
Financial Sanction Details
Financial\Administrative Sanction No: 0000000005 Financial\Administrative Sanction Date 4/6/2012
Fin. Sanc. Amt. (in Rs) NREGA:205000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
205000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil43.19421813.98
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil225429450
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)193009300
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead14118.32580.3
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)6.332557.616189.608
6False work for R.C.C. and P.C.C. work in plinth and foundation127128.616332.2
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars17851.79202.6
8Stacking and boxing.-Moorum or sand4.512.656.7
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 141404140
10FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size4.5125.7565.65
11FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders13.52783753
12Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil32.5773.012377.9357
13Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum31.1398.383062.5694
14Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)59.1216.6912806.379
15Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.202.7412.583613.75
16work charge12900029000
Total Activity 205000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL7.88761.56000.62
220 mm HG Chips130003000
3blasting2457017150
4BULLOCK CART244009600
5Cement(bori)3630510980
6Centering and Shuttering10090.69060
7Contagecny7.510007500
8deasil pump125506600
9Photocopy & staionary65003000
10Sand2.54565.351435.989
11STEEL15060.79105
12T&P10120012000
13Temporary shed130003000
14साईनबोर्ड 115001500
Total Material 100000