S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cement Concrete 1:8:16 with 40 mm Gauge stone aggregate | 12.74 | 2419.14913657771 | 30819.96 |
2 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 118.12 | 3624.28047748053 | 428100.01 |
3 | 12.5 mm thick cement plaster 1:5. | 668.88 | 129.582705418012 | 86675.28 |
4 | Supplying and planting permanent trees including digging of earth pits size 75cmx75cmx75 cm deep, refilling the excavated earth with manure supplied
@ 0.113 cum each and watering Supplying through tractor tanker. | 100 | 295.9183 | 29591.83 |
5 | Making lawns including ploughing & dragging with Sohaga breaking of clods, removal of earth rubbish dressing & Supplying doob grass roots and planting at 15 cm. apart including Supplying and spreading of farm yard manure@ 0.18 cum per 100 sqm & loosening. | 3901.8 | 12.3380465426214 | 48140.59 |
6 | Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing
of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (i) 1.5 meter vertical lift and 15 meter horizontal lead | 76.41 | 150.821751079702 | 11524.29 |
7 | Miscellaneous Works (6.1) jungle cleaning including uprooting of ordinary vegetation and bush wood. | 4645 | 10.7890828848224 | 50115.29 |