Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:07:08 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: MANGLIYA
Work Code: 1719006010/RC/22012034176672 (c.c.road pp II manrega manglua devkaran to bhavrla)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/2/2013 Work start date : 28/7/2013
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 10/1369 Sanction Date : 21/3/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
54000 35000 0 0 200000 0 0 235000 0 289000
Financial Sanction Details
Financial\Administrative Sanction No: 10/1023 Financial\Administrative Sanction Date 12/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:89000 Panchparmeshwar
200000
Scheme 2
0
Scheme 3
0
Total
289000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)86.22383.5205457.7
2Labour only for item no. 0413 (for any proportion of cement concrete)86.2363.931368.18
3False work for R.C.C. and P.C.C. work in plinth and foundation30150.94527
4Deduct for concrete unvibrated in item no. 0425131562028
5Transportation of metal 84.2540.143381.795
6Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.75.86155.411788.644
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.38.8139.865426.568
8Loading of metal in truck, dumper etc.84.2523.762001.78
9Unloading of metal in truck, dumper etc.84.2511.881000.89
10Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.84.25342864.5
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work81.3773.45972.558
12Collection of hard moorum including stacking at quarry.84.25118.39966.775
13contingency128002800
Total Activity 289000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL75.8680060688
2CEMENT(BEGS)439270118530
3Centring & Shuttering3095.62868
4contangency and work charges115001500
5mason perday182003600
6sand cum38.870027160
7Transportanion of hard Muram84.2540.143381.795
8Transportation of sand38.8139.865426.568
9transpotation of matel75.86155.411788.644
10Vibrator000
Total Material 235000