S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 103.95 | 65 | 6756.75 |
2 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 944.5 | 58.1 | 54875.45 |
3 | TRANSPORTATION OF MATERIAL | 215.01 | 234.37 | 50391.8937 |
4 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 480 | 467.7 | 224496 |
5 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 173.25 | 262.5 | 45478.125 |
6 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 480 | 347 | 166560 |
7 | Site clearance, cutting grass, raking into heaps and removing off the premises | 900 | 1.6 | 1440 |