State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: ANJANI
Work Code: 1711003022/WC/9993658641 (GABION STRUCTURE PEERAGHAT NALA PAR)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2015 Work start date : 22/10/2015
Present status : Non-existent Proposed Status : Gabions
Tech Sanction Details
Technical Sanction No. : 175/aj Sanction Date : 23/9/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
356000 194000 0 0 0 0 0 194000 0 550000
Financial Sanction Details
Financial\Administrative Sanction No: 08/anj Financial\Administrative Sanction Date 24/9/2015
Fin. Sanc. Amt. (in Rs) NREGA:550000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
550000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil103.95656756.75
2Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.944.558.154875.45
3TRANSPORTATION OF MATERIAL215.01234.3750391.8937
4Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite.480467.7224496
5FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.173.25262.545478.125
6FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders480347166560
7Site clearance, cutting grass, raking into heaps and removing off the premises9001.61440
Total Activity 550000
S.NoMaterialQuantityUnit PriceTotal
1Binding wire10507073500
2Bolder502.6234.37117794.362
3Display board110001000
4First Aid Box1200200
5PhotoCopy & Stationary110001000
6Photographs1500500
Total Material 194000