Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:23:37 AM 
Back  
State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: RAMSALAIYA
Work Code: 1711006060/LD/22012034521176 (khel maidan nirman / ps school / dhaneta)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2020 Work start date : 20/7/2020
Present status : Not Exist Proposed Status : Levelling/shaping of Wasteland Land for Community
Tech Sanction Details
Technical Sanction No. : 1711006/2020-2021/286137/TS Sanction Date : 30/7/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
53852.82 194354.59 1285.93 2034.84 0 0 0 198000 0 251528.18
Financial Sanction Details
Financial\Administrative Sanction No: 1711006/2020-2021/286137/AS Financial\Administrative Sanction Date 12/8/2020
Fin. Sanc. Amt. (in Rs) NREGA:251816 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
252000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.11406.541947368421057457.82
2Filling foundation, around masonry work, plinth, sides of foundation etc. with moorum I/c ramming layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m.356.16273.44620395327997390.6
3(a) C.C. 1:2:4 (1cement, 2sand, 4metal)11.093812.7015329125342282.86
4(c) C.C. 1:4:8 (1cement, 4sand, 8metal)0.992818.878787878792790.69
5(k) Cement mortar 1:8 (1cement, 8sand)6.63741.2575757575824692.3
6(d) Cement mortar 1:6 (1cement, 6sand)26.499.48787878787882626.48
7(XV) 10 Km. Lead0.91233.043956043956212.07
8(XXIX) 50 Km. Lead9.42567.2675159235675343.66
9(X) 5.0 Km. Lead356.16152.1127863881454176.49
10(XV) 10 Km. Lead2.54210.070866141732533.58
11(XXIX) 50 Km. Lead5.21510.1497120921312657.88
12Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complete compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete.319.223.93258145363417639.28
13(b) Dense or hard soil2.97146.026936026936433.7
14Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13578.363578.36
Total Activity 252000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.30188851152.093
20038-Tractor with ripper attachment0.43732124928.8252
30055-Smooth Wheeled Roller 8 to 10 tonne4.56462361077.2456
40057-Water Tanker 5 to 6 KL Capacity6.384118753.312
50084-Hire charges of Diesel truck - 9 tonne (without POL)12.6371224228332.3782
60297-Stone Aggregate(single size): 10 mm nominal size1.2199630768.537
70367-Portland Cement4.1651551122953.8661
80368-White cement 0.0004157446.2976
90810-Moorum356.1618967314.24
100982-Coarse sand (zone III)0.46531028.16478.402848
110983-Fine sand (zone IV)6.83121076.257352.079
121235-Diesel oil152.44986810366.5864
135001-Mobil oil5.3978182.9987.25762
147900-Modular common burnt clay bricks of class designation 7.53676.44.1315183.532
15MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT6.47535253399.5325
16MR6032-Snowcem/ durocem0.00072778919.4523
17MR6039-Water383040.051915.2
18MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)2.70146821842.3548
Total Material 165000