S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 0 | 0 | 0 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 16 | 2057.2 | 32915.2 |
3 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 37 | 1862.3 | 68905.1 |
4 | Add extra for brick masonry in square or rectangular pillars. | 7 | 147 | 1029 |
5 | Honey comb brick masonry with class 25 open bhatta or pajawa burnt brick 10cm Thick.-In cement mortar 1:4 | 377 | 146.8 | 55343.6 |
6 | Providing 6mm thick corrugated asbestos cement sheets roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm dia. G.I. plain and bitumen washer complete excluding the cost of purlines rafters and trusses. | 77 | 221.4 | 17047.8 |
7 | Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick. | 72.5 | 189.3 | 13724.25 |
8 | Providing and fixing water closet squatting pan (Indian type W.G. pan) size 580mm (earth work bed concrete, foot rests and trap to be measured and paid for separately)-Glazed earthenware Orissa pattern | 50 | 504.1 | 25205 |
9 | Providing and fixing 100mm size P or S trap for water closet squatting pan including jointing the trap with pan and soil pipe in cement mortar 1:1 (1cement, 1fine sand)-Glazed earthenware. | 50 | 225.2 | 11260 |
10 | Providing and fixing on Wall face Asbestos Cement building pipe of the following nominal size including jointing with sun yarn soaked in bitumen and cement mortar 1:2 (1cement, 2sand) complete .-100 mm dia. | 125 | 92 | 11500 |
11 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 182 | 79.9 | 14541.8 |
12 | contingency | 1 | 1050 | 1050 |
13 | Labour difference in case of old SoR | 891 | 14 | 12474 |