S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 0 | 0 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1600 | 1.8 | 2880 |
3 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 1838 | 23.1 | 42457.8 |
4 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 259.3 | 114.6 | 29715.78 |
5 | Labour only for Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm. | 526.1 | 26.358 | 13866.9438 |
6 | Lossening of hard soil by ploughing the existing gound | 1 | 15160 | 15160 |
7 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 3675 | 50 | 183750 |