S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1000 | 1000 |
2 | Brick bat filling in trenches or soak pits. | 9 | 242.2 | 2179.8 |
3 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand) | 43.268 | 76.5 | 3310.002 |
4 | Transportation rates for Lime (fat), Hydraulic or any other. | 54 | 44.8 | 2419.2 |
5 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 0.263 | 2610.2 | 686.4826 |
6 | Labour only for boulder soling hand packed excluding consolidation. | 1.342 | 1998.7 | 2682.2554 |
7 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti | 98.91 | 352.6 | 34875.666 |
8 | Collection of soft moorum including stacking at quarry. | 51.39 | 108.2 | 5560.398 |
9 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 137.34 | 542.29 | 74478.1086 |
10 | Collection of quarried stone or rubble. | 13.962 | 2302 | 32140.524 |
11 | contingency | 1 | 5571 | 5571 |
12 | Labour difference in case of old SoR | 14 | 722 | 10108 |