S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 2700 | 6.65 | 17955 |
2 | Extra for every additional lift of 1.5 m or part there of-Disintegrated/ soft or hard rock | 4050 | 21.79 | 88249.5 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 28 | 3202.63 | 89673.64 |
4 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 59.4 | 195.26 | 11598.444 |
5 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 270 | 379.21 | 102386.7 |
6 | SIGN BOARD | 1 | 3682 | 3682 |
7 | Lossening of hard soil by ploughing the existing gound | 8100 | 3.6 | 29160 |
8 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 8100 | 74.83 | 606123 |