State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KERBANA
Work Code: 1711003040/IF/22012034556654 (कपिलधारा कूप निर्माण कमला पर्वत सिंह लोधी केरबना)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2020 Work start date : 16/5/2020
Present status : Not Exist Proposed Status : Bondry Block - Coastal Shelter Belt-Individuals
Tech Sanction Details
Technical Sanction No. : 1711003/2020-2021/124403/TS Sanction Date : 22/5/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
122614.21 115416.5 60713.73 3362.04 0 0 0 180000 0 302106.48
Financial Sanction Details
Financial\Administrative Sanction No: 1711003/2020-2021/124403/AS Financial\Administrative Sanction Date 22/5/2020
Fin. Sanc. Amt. (in Rs) NREGA:302106 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
303000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m26.3657.60811836115331518.55
2Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)23.553904.3065817409891946.42
3(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)3.115280.3826366559516421.99
4Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column50.71156.781108262677950.37
5(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars71.5971.75820645341535137.17
6(j) 5.0 Km. Lead9174.0844444444441566.76
7(X) 5.0 Km. Lead9194.3666666666671749.3
8(X) 5.0 Km. Lead9152.1133333333331369.02
9(b) Dense or hard soil60.24148.7749003984068962.2
10(I)1.50 m. to 2.00 m.20.18201.5891972249754068.07
11(II)2.00 m. to 2.50 m.15.68211.6517857142863318.7
12(XVIII)10.00 m. to 10.50 m.7.3751.4150684931515485.33
13(XIX)10.50 m. to 11.00 m.7.3774.7219178082195655.47
14(XX)11.00 m. to 11.50 m.6.92798.0534682080925522.53
15(XXI)11.50 m. to 12.00 m.6.92821.3598265895955683.81
16(XXII)12.00 m. to 12.50 m.6.92844.6676300578045845.1
17(XXIV)13.00 m. to 13.50 m.6.92891.283236994226167.68
18(III)2.50 m. to 3.00 m.20.18497.76114965312210044.82
19(X)6.00 m. to 6.50 m.8.67830.2675893886977198.42
20(XI)6.50 m. to 7.00 m.8.7848.4310344827597381.35
21(XII)7.00 m. to 7.50 m.8.31866.0746089049347197.08
22(XIII)7.50 m. to 8.00 m.8.03884.7596513075977104.62
23(XIV)8.00 m. to 8.50 m.7.95902.6968553459127176.44
24(XV)8.50 m. to 9.00 m.7.95920.855345911957320.8
25(XVI)9.00 m. to 9.50 m.7.6939.1276315789477137.37
26(XVII)9.50 m. to 10.00 m.7.6957.2894736842117275.4
27(XXIII)12.50 m. to 13.00 m.6.921092.680635838157561.35
28(IV)3.00 m. to 3.50 m.9.81737.3384301732937233.29
29(V)3.50 m. to 4.00 m.9.81752.2915392456687379.98
30(VI)4.00 m. to 4.50 m.9.81767.4791029561677528.97
31(VII)4.50 m. to 5.00 m.9.42782.5297239915077371.43
32(VIII)5.00 m. to 5.50 m.9.42797.4893842887477512.35
33(IX)5.50 m. to 6.00 m.9.04812.372787610627343.85
34Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9161.0255555555561449.23
35Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9224.5766666666672021.19
Total Activity 302000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper2.66598852359.3215
20084-Hire charges of Diesel truck - 9 tonne (without POL)1.057422422370.6908
30297-Stone Aggregate(single size): 10 mm nominal size3.27456302062.935
40325-Blasting powder36.80252.491931.73698
50326-Blasting fuse (fuse wire)40.126814.51582.239868
60367-Portland Cement8.7664551148311.6304
70983-Fine sand (zone IV)11.99661076.2512911.34075
81005-Twisted steel/deformed bars0.751654284079.6848
91235-Diesel oil12.255268833.3536
103-Display Board1500500
115001-Mobil oil0.4335182.979.28715
127335-Binding wire0.715955.5839.789722
13MR6007-Hier Charges for Centering3.1098002487.2
14MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)19.5168213305.82
15MR6091-WOOD-Kail wood 2nd class0.181115825.62866.01616
Total Material 94800