S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 275.5 | 4.56 | 1256.28 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 36 | 2829.3 | 101854.8 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 67.76 | 162.7 | 11024.552 |
4 | Labour only for item no.1266 | 30 | 257 | 7710 |
5 | Making repairs to joinery at angles with & including 300mm x 25mm x 3mm length of M.S. flat forged to shape and let into wood work, counter sunk, drilled and screwed. | 39.2 | 325.7 | 12767.44 |
6 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 4.96 | 96.2 | 477.152 |
7 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil. | 261.36 | 14 | 3659.04 |
8 | Lossening of hard soil by ploughing the existing gound | 71.8 | 325.5 | 23370.9 |