State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: SADAHANA
Work Code: 1713003086/RC/22012034218527 (ग्रेवल मार्ग मुख्‍य मार्ग से अनुपम पाण्‍डेय के घर )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 1/5/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1949 Sanction Date : 15/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
364000 467000 0 0 0 0 0 467000 0 831000
Financial Sanction Details
Financial\Administrative Sanction No: 5/68 Financial\Administrative Sanction Date 17/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:831000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
831000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Site clearance, cutting grass, raking into heaps and removing off the premises49801.67968
3Dag-beling-Single spade stroke minimum 75mm deep18000.2360
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)2.4122343.85653.2456
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)0.33400.41020.12
6Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)7.83185514524.65
7Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing10.5959624.81
8Collection of approved soil having CBR not less then 12, including stacking at quarry.195.29166.632535.314
9Transportation of metal 195.29223.5543657.0795
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1483.2102.69152309.808
11Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia16.45964.615867.67
12Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.7.5347626070
13Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making952.521.520478.75
14Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact1279.2626.233516.612
15Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)195.2939.67733.484
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work000
17Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work952.581.277343
18Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil9.588.3838.85
19Collection of puddle earth including stacking at quarry1483112.8167282.4
20Collection of hard moorum including stacking at quarry.360422.36152049.6
21Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)211352270
22Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete ) With Local Stone (i) 5th Kilometre Stone (ii) Ordinary Kilometer Stone (iii) 200 m stone2334668
231902 Transportion of metal11000010000
24work charge15600056000
Total Activity 831000
S.NoMaterialQuantityUnit PriceTotal
120 MM Graded Metal0.252200550
240 mm metal(1.3.6)2.1720004340
3BGSY SIGN BOARD (600X600MM)159335933
4Cement7030021000
5Compaction of Selected soil1483.22334113.6
6contangency and work charges12500025000
7contigency111
8hard shoulder compaction195.6234498.8
9Kilometre Stone (200 M)2334668
10Kilometre Stone (ordinary)211352270
11Mate9014913410
12Rolling Earth & moorum4802311040
13Transportanion of hard Muram1160000160000
14Transportation of embankment s1483.2102.69152309.808
15पत्‍थर7.8200015600
16रेत6.5250016250
Total Material 467000