The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:11:22 PM 
Back  
State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Silotiya
Work Code: 1722005027/WC/9993647135 (hariram magilal kapil dhar kup)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/6/2013 Work start date : 24/2/2014
Present status : Existing Proposed Status : Artificial Recharge of Well Through Sand Filter
Tech Sanction Details
Technical Sanction No. : 133(13-14) Sanction Date : 14/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
98000 65000 0 0 0 0 0 65000 0 163000
Financial Sanction Details
Financial\Administrative Sanction No: 266(13-14) Financial\Administrative Sanction Date 15/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:163000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
163000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard110001000
2Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like.5444.82419.2
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.2632610.2686.4826
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.3421998.72682.2554
5Brick bat filling in trenches or soak pits.9242.22179.8
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:4 (1cement, 4sand)13.962230232140.524
715mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)43.26876.53310.002
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work51.39108.25560.398
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work98.91352.634875.666
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work132.9542.2972070.341
11contingency154955495
Total Activity 163000
S.NoMaterialQuantityUnit PriceTotal
120 MM Graded Metal0.22650143
240 MM AGGREGATE1.21600726
3Blasting Holas16411018040
4Brick70002.819600
5Cement3629010440
6CONTANGANCY155105510
7desal pump rent2044.8896
8Display board110001000
9Masonry Stone000
10P V C PIPE000
11sariya000
12sattring000
13TRAINSPORT CHARGE000
14रेत4.818008640
Total Material 65000