State: MADHYA PRADESH District: REWA Block: MAUGANJ Panchayat: HARRAHA
Work Code: 1713006080/RC/22012034321300 (SUDUR SADAK GRAM HARRAHA AGANBADI SE KORIYAN TOLA KI OR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2016 Work start date : 23/1/2017
Present status : Earthern road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 472/80 Sanction Date : 9/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
892000 595000 0 0 0 0 0 595000 0 1487000
Financial Sanction Details
Financial\Administrative Sanction No: 11/080 Financial\Administrative Sanction Date 17/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:1487000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1487000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Site clearance, cutting grass, raking into heaps and removing off the premises10000330000
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)2.8293488.29868.1178
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)30.242545.576975.92
5Transportation of metal 130592.16120268.8
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.2976.5199.27295478.1477
7Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.19.75385076037.5
8Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making130518.424012
9Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact2976.5124.773519.797
10Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)33035.911847
11Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to A or B or C of Table 2.1of IRC:SP:77-2008 having CBR not less576.9525302872.5
12Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau576.9525302872.5
13Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:508.615076290
14Site clearance, cutting grass, raking into heaps and removing off the premises15933.75933.7
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.17462.97462.9
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.13074.83074.8
17Lossening of hard soil by ploughing the existing gound13052.73523.5
18Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed13055065250
Total Activity 1487000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Selected soil606522.35135552.75
2Transportanion of hard Muram2931.5563.27185479.1685
3Transportanion of Soft Muram2855.5563.27180670.6485
4सम्‍पूर्ण सामाग्री क्रर्य19300093000
Total Material 595000