Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:38:59 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KADHURA
Work Code: 1702001047/RC/22012034340398 (Sudur Samprak Gram Kadora Se Hanuman Mandir Tak)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/5/2017 Work start date : 1/6/2017
Present status : No Road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 2352 TS Sanction Date : 22/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
858000 572000 0 0 0 0 0 572000 0 1430000
Financial Sanction Details
Financial\Administrative Sanction No: 138 Financial\Administrative Sanction Date 31/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:1430000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1430000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.115404.450776
2Chain and compass survey.-Canals/Roads1.865841086.24
3Fly levelling for fixing temporary bench marks.-Upto 15 m interval2.264711064.46
4Levelling - Headwork.-Below 5 m interval2.2615703548.2
5Levelling - Headwork.-Above 15 m interval2.26502.41135.424
6Stacking without boxing.-Puddle earth, moorum, sand or kankar95611.310802.8
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1250000250000
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.95644.442446.4
9Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN95668.765677.2
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making321830.999436.2
11Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor406435.8145491.2
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work7315.38487.3638633.0232
13Collection of hard moorum including stacking at quarry.656140.792299.2
14Field Technical Supervisior Charge-FTSC12700027000
Total Activity 1430000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work351830.9108706.2
2Compaction of GSB85668.758807.2
3Compaction of Selected soil396435.8141911.2
4contigency16800068000
5Display board150005000
6HumePipes13500035000
7loosing and compexion11000010000
8Rolling Earth & moorum11000010000
9Transpotation Charges14500045000
10गिटी 20 mm13550035500
11पानी टेंकर11900019000
12मुरम12000020000
13रोलर11500015000
Total Material 572000