S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 54.98 | 81.2 | 4464.376 |
2 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 231 | 0.5 | 115.5 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 45.55 | 3296.4 | 150151.02 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 69.3 | 154.2 | 10686.06 |
5 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 77 | 6.3 | 485.1 |
6 | Transportation of metal | 95.13 | 23.052 | 2192.93676 |
7 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 49.48 | 23.6 | 1167.728 |
8 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 49.48 | 118.8 | 5878.224 |