Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:05:36 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: NAHAR MAL
Work Code: 1725007049/RC/22012034227044 (पंच परमे(वर सी सी रोड निर्माण कार्य (1)किचन शेड प्)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/6/2014 Work start date : 2/6/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 14xz Sanction Date : 16/6/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
46000 31000 0 0 133000 0 0 164000 0 210000
Financial Sanction Details
Financial\Administrative Sanction No: 05xz Financial\Administrative Sanction Date 21/6/2014
Fin. Sanc. Amt. (in Rs) NREGA:77000 Panchparmeshwar
133000
Scheme 2
0
Scheme 3
0
Total
210000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil54.9881.24464.376
2Dag-beling-Double spade "v" shaped stroke 100mm deep2310.5115.5
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)45.553296.4150151.02
4False work for R.C.C. and P.C.C. work in plinth and foundation69.3154.210686.06
5Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)776.3485.1
6Transportation of metal 95.1323.0522192.93676
7Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.749.4823.61167.728
8Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)49.48118.85878.224
9work charge34010034000
Total Activity 210000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL3880030400
2Cement29030087000
3Centering and Shuttering63001800
4Display board110001000
5mixer machin (perday)610006000
6PhotoCopy & Stationary100022000
7Photograph520100
8Plastic50773850
9SAND2080016000
10Thermocoal1268268
11Transportation charges105005000
12Vibrator (Per Day)20061200
13पानी टेकर85004000
14मुरुम परिवहन50107.645382
Total Material 164000