State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DUBAHAI KHURD
Work Code: 1713004056/RC/22012034329623 (Ts1837 sudoor gram sadak nirman balmeek mishra ke ghar ke pass se hanuman mandir taraf)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 26/1/2017 Work start date : 3/3/2017
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1837 Sanction Date : 8/2/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
943000 534000 0 0 0 0 0 534000 0 1477000
Financial Sanction Details
Financial\Administrative Sanction No: 07/56/ Financial\Administrative Sanction Date 20/2/2017
Fin. Sanc. Amt. (in Rs) NREGA:1477000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1477000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard000
2Site clearance, cutting grass, raking into heaps and removing off the premises118001.720060
3Dag-beling-Single spade stroke minimum 75mm deep168000.35040
4Transportation of metal 3072.524112.41345382.42284
5Transportation of metal 1439.232412.02592992.36864
6Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia16964.415430.4
7Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1082.1721.623374.872
8Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1079.522324828.96
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed- Dense or hard soil for Tank Work819.54287.371546.0166
10Collection of puddle earth including stacking at quarry1539.148121.3186698.6524
11Collection of hard moorum including stacking at quarry.1236.16140.1173186.016
12SIGN BOARD139343934
13Labour difference in case of old SoR10241414336
Total Activity 1477000
S.NoMaterialQuantityUnit PriceTotal
11904 tranportion of rcc hum pi12000020000
22043 soil Compaction material12500025000
3Compaction of Earth Work15400054000
4Compaction of GSB12000020000
5contigency12500025000
6earth work watring15400054000
7embankment with approved mater180008000
8Gravel or moorum15000050000
9hume pipe12000020000
10hume pipe np3-600mm12000020000
11Moorum12000020000
12Soil transport17500075000
13sub grade transportion130003000
14sub grade watring120002000
15Transportanion of hard Muram12500025000
16Transportanion of Soft Muram12500025000
17Transportation Of Earth Work12500025000
18water tanker190009000
19बोर्ड11200012000
20मुरम12000020000
21रोलर12200022000
Total Material 534000