S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 50m And lift upto1.5m-Dense or hard soil | 1000 | 74.83 | 74830 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 20 | 3829.1 | 76582 |
3 | Lossening of hard soil by ploughing the existing gound | 2000 | 3.6 | 7200 |
4 | contingency | 1 | 17388 | 17388 |