State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PALAYCHHA(P)
Work Code: 1703004041/DP/22012034433647 (CPW KABRISTAN DARGAH WALI)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2018 Work start date : 4/10/2018
Present status : Not Exist Proposed Status : Construction of Stone contour Bund for Community
Tech Sanction Details
Technical Sanction No. : 3385 Sanction Date : 1/10/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
516990 209260 0 0 0 0 0 210000 0 726250
Financial Sanction Details
Financial\Administrative Sanction No: 46/41 Financial\Administrative Sanction Date 2/10/2018
Fin. Sanc. Amt. (in Rs) NREGA:726250 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
727000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Thick shrub jungle (area above 50% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting out (for survey works)12347558425
2Cement Lime Mortar 1:1:3 ( 1 cement, 1 lime putty, 3 sand )20032064000
3Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Loose or soft soil6637538250
4Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil153154725
5Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Hard rock requiring blasting234279821
6Dag-beling-Single spade stroke minimum 75mm deep5.363631945.68
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:6:12 (1 cement, 6sand, 12metal)32.5561820
8Labour only for item no.061410027527500
9Labour only for item no. 0618.295400118000
10Providing and fixing plain trellis work of half rounded (split) bamboos 40mm dia. placed at 40mm apart (frames to be paid separately) including fixing 40mm dia. beading of half round bamboos.12526533125
11Labour only for item No. 0801.501748700
12Providing and fixing pressed steel door frames manufactured from commercial mild steel sheet of 1.25mm thickness including hinges jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50 X 25mm, or base ties of 1.25mm presse-Profile C (double rabate 115mm X 50mm size)13250066000
13Pointing on brick work with lime mortar 1:2 (1lime putty, 2sand)-Flush pointing11547554625
14Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Ruled pointing25.4640010184
15Fine dressed stone slab flooring over 20mm average thick base of cement mortar 1:5 (1cement, 5sand) with joints finished flush.(Area of each stone should not be less than 0.20 Sqm.)-With 25 mm thick stone225500112500
16Oil bound distemper of approved quality of any shade two coats on new works including priming coat.5425013500
17Grass cutting and made of bundel 8"-10" dia with storage Mandays per hundred bundels595174103530
Total Activity 727000
S.NoMaterialQuantityUnit PriceTotal
140 mm size HG metal3004212600
2Cement6032019200
3contengency no11980019800
4Display board120002000
5mooram111105005000
6Sand (mortar)15200030000
7Stone other than Granite125006000
8Transportation charges of mate303500105000
9water10100010000
Total Material 210000