State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: SHAHPURA
Work Code: 1725007070/IF/711 (कपिल धारा कूप सह मेढ बंधान निर्माण कार्य लक्ष्‍मण )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/4/2011 Work start date : 26/4/2011
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 45awa Sanction Date : 23/4/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
90000 60000 0 0 0 0 0 60000 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: 4awa Financial\Administrative Sanction Date 25/4/2011
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead195.39305861.7
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m74.3524.61829.01
3Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)4.722445.311541.816
4False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift87.56151.313247.828
5Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars148.2466817.2
6Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil38.1561.72353.855
7Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum57.2280.24589.044
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)31.79196.56246.735
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.146.86483.8171052.3366
10Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)0.225774.275154.854
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work37.361.42290.22
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work37.362.52331.25
13work charge11600016000
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL58504250
2blasting1758014000
3BULLOCK CART242506000
4Cement(bori)333009900
5Centering and Shuttering87.5857437.5
6Creach facility1100100
7deasil pump133454485
8Display board115001500
9RR stone (Granite)1100100
10Sand (mortar)122002200
11sand (t)510005000
12sariya148.2507410
Total Material 62400