Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:31:13 AM 
Back  
State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: SADAHANA
Work Code: 1713003086/RC/22012034342237 (Sudoor Sadak Nahar se bhavniha talab ki sadhna)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 2/5/2017 Work start date : 15/6/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 477/86... Sanction Date : 14/6/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
700000 750000 0 0 0 0 0 750000 0 1450000
Financial Sanction Details
Financial\Administrative Sanction No: 987/86 Financial\Administrative Sanction Date 15/6/2017
Fin. Sanc. Amt. (in Rs) NREGA:1450000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1450000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Site clearance, cutting grass, raking into heaps and removing off the premises12.36145617996.16
3Medium shrub jungle (25% to 50% area covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting out (for survey works)5842524650
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m56.36145081722
5Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.11400014000
6Providing and laying on terrace upto floor two level lime concrete with graded brick aggregate 25mm nominal size and 50% mortar comprising of 1 lime putty and 2 surkhi and curing etc. complete.1200000200000
7Providing and fixing 30mm thick double leaf panelled, glazed or panelled and glazed shutters for doors, windows and clerestory window including black enamelled M.S. butt hinges with necessary screws.(half glazed and half panelled)-Other structural wood (seasond & chemicaly treated wood)12324129643
8Providing and fixing 25mm thick double leaf panelled, glazed or panelled and glazed shutter for cupboards etc. including black enamelled M.S. butt hinges with necessary screws.(half glazed and half panelled)-Second class Indian teak wood2331425332025
9Providing and fixing 25mm thick double leaf panelled, glazed or panelled and glazed shutter for cupboards etc. including black enamelled M.S. butt hinges with necessary screws.(half glazed and half panelled)-Bija wood45.3692541958
10Providing and fixing in position door shutters made up of cold rolled framed profiles of pressed steel made from commercial M.S. sheet I/c buzzers(shock absorbers) lock, 30cm Long strike plate and necessary tower bolts, aldrop 300x16mm Etc. complete, pain-Double panel shutter type-A (Made of 1.00mm C.R. sheet)12332539975
11Labour only for item no.1220-50 mm thick1200000200000
12Chequered precast cement concrete tiles 22mm thick with aggregate of size upto 6mm in floors, treads of steps and landing on 20mm thick bed of cement mortar 1:6 (1cement, 6 sand) jointed with neat cement slurry with pigment to match the shade of the tiles-Medium shades using approximately 50% white cement and 50% ordinary cement.14000040000
13Removal of old broken glass panes (any thickness or size quality or description) from wood frames, glazed with putty or fixed with beads.12321226076
14Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1150000150000
15Collection/Excavation of Gravel Material meeting the requirements of Hard moorum as detailed in RES SOR chapter No. 03 Notes Clause 3.2(C) including stacking and all leads and lifts up to the loading point at quarry.1250000250000
Total Activity 1450000
S.NoMaterialQuantityUnit PriceTotal
12043 soil Compaction material1100000100000
2Compaction of Earth Work1200000200000
3Compaction of GSB15000050000
4hard shoulder compaction1100000100000
5Transportation charges15000050000
6transportion1250000250000
Total Material 750000