S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Thick shrub jungle (area above 50% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting out (for survey works) | 1 | 5000 | 5000 |
2 | Cement Mortar 1:5 ( 1 cement, 5 sand ) | 717.9 | 44.7 | 32090.13 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 740.4 | 52.7 | 39019.08 |
4 | Providing and laying on terrace upto floor two level lime concrete with graded brick aggregate 25mm nominal size and 50% mortar comprising of 1 lime putty and 2 surkhi and curing etc. complete. | 2 | 6000 | 12000 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 2.25 | 2504 | 5634 |
6 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 3.8 | 3307.4 | 12568.12 |
7 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 34.3 | 1079 | 37009.7 |
8 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 88 | 127.6 | 11228.8 |
9 | Transportation of metal | 717.9 | 78.39 | 56276.181 |
10 | Transportation of 20 MM metal | 2 | 218.7 | 437.4 |
11 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 17.15 | 306.18 | 5250.987 |