State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: ANJANI
Work Code: 1711003022/WC/22012034974776 (AMRIT SAROVAR NIRMAN KARY ANJANI)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 11/4/2022 Work start date : 26/4/2022
Present status : Non-existent Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 768/TS Sanction Date : 21/4/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
1171000 607000 0 0 50000 0 0 657000 0 1828000
Financial Sanction Details
Financial\Administrative Sanction No: 530/AN Financial\Administrative Sanction Date 25/4/2022
Fin. Sanc. Amt. (in Rs) NREGA:1778000 Public Contribution
50000
Scheme 2
0
Scheme 3
0
Total
1828000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.9371.257.0265786.175
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil5460.38144.07786676.9466
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil202.594.4519126.125
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)34.23947.45135002.79
5False work for R.C.C. and P.C.C. work in plinth and foundation1.363947.455368.532
6Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making5460.3817.4495229.0272
7FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.1638.1118.3630075.6996
8FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders364.5452.89165078.405
922cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.0141386.17379.2525635.664
Total Activity 1828000
S.NoMaterialQuantityUnit PriceTotal
120 MM Gitti60120072000
240 M.M. Gitti10110011000
3Boulder Transportation144.82232.9633737.2672
4CEMENT (BEGS)351395138645
5centring13810013800
6Convergence Amount15000050000
7pitching stone106.71000106700
8Rolling Compaction2691.9817.4446948.1312
9Tansportation of water4202.531062.6
10काली मिटटी420130.2554705
11मुरुम परिवहन965.37104.95101315.5815
12रेत 19.34140027076
Total Material 657000