Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:25:20 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RICHHARIKHURD(P)
Work Code: 1703004070/RC/22012034308205 (kharanja nirman harnam ke makan se toran ke khaliyan ki or )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2016 Work start date : 22/3/2016
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 70/4681 Sanction Date : 16/3/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
734760 188288 0 0 0 0 0 189000 0 923048
Financial Sanction Details
Financial\Administrative Sanction No: 70/044 Financial\Administrative Sanction Date 20/3/2016
Fin. Sanc. Amt. (in Rs) NREGA:923048 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
924000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard150005000
2Dag-beling-Single spade stroke minimum 75mm deep10000.3300
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.1800261.7471060
4Transportation rates for Masonry stone.267.3413.98110656.854
5Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.885125110625
6Loading of metal in truck, dumper etc.88528.6225328.7
7Unloading of metal in truck, dumper etc.88514.3112664.35
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.74544.733301.5
9Collection of hard moorum including stacking at quarry.885142.5126112.5
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.20001428000
Total Activity 924000
S.NoMaterialQuantityUnit PriceTotal
1Display board150005000
2खण्‍डा परिवहन267.3413.98110656.854
3मुरम परिवहन (1)88582.0772631.95
Total Material 189000