State: MADHYA PRADESH District: NARMADAPURAM Block: PIPARIYA Panchayat: SANDIYA
Work Code: 1732006003/SK/712 (Bharat Nirman Rajeev Gandhi Sewa Kendra,SANDIYA)
Work Category: Sewa Kendra
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/8/2013 Work start date : 17/9/2013
Present status : 00 Proposed Status : New Construction
Tech Sanction Details
Technical Sanction No. : 957/2013 Sanction Date : 27/8/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
70861 47240 0 0 0 0 0 47300 0 118101
Financial Sanction Details
Financial\Administrative Sanction No: 9576/2013 Financial\Administrative Sanction Date 7/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:118101 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
119000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil3.16870.6223.6608
2Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-250 mm20355.37106
3Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)5.9523777.622484.2752
4False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift75.53177.613414.128
5False work for R.C.C. and P.C.C. work in plinth and foundation19.92106.52121.48
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars1292.2156.372751.423
Total Activity 119000
S.NoMaterialQuantityUnit PriceTotal
120 MM METAL000
2BRICK000
3CEMENT(BEGS)12527033750
4Display board000
5Sand000
6Transpotation Charges000
7सरीया254.55313488.5
Total Material 47300