S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 3.168 | 70.6 | 223.6608 |
2 | Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-250 mm | 20 | 355.3 | 7106 |
3 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size) | 5.952 | 3777.6 | 22484.2752 |
4 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 75.53 | 177.6 | 13414.128 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 19.92 | 106.5 | 2121.48 |
6 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 1292.21 | 56.3 | 72751.423 |