S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 700 | 0.43 | 301 |
2 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 39.38 | 1444.41 | 56880.8658 |
3 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 18.45 | 4408.24 | 81332.028 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 105 | 182.28 | 19139.4 |
5 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 367.5 | 2829.14 | 1039708.95 |
6 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 1 | 20000 | 20000 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 1120 | 121.43 | 136001.6 |
8 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 3037.5 | 169.85 | 515919.375 |
9 | SIGN BOARD | 1 | 5000 | 5000 |
10 | contingency | 1 | 1416.78 | 1416.78 |