S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Medium shrub jungle (25% to 50% area covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting out (for survey works) | 0 | 78.5 | 0 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 275 | 96.2 | 26455 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 200 | 0.3 | 60 |
4 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 37.5 | 882 | 33075 |
5 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 240 | 211 | 50640 |
6 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand) | 90 | 1858.7 | 167283 |
7 | Transportation rates for Masonry stone. | 1 | 29400 | 29400 |
8 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 275 | 96.2 | 26455 |
9 | SIGN BOARD | 1 | 5000 | 5000 |
10 | contingency | 1 | 40062 | 40062 |