State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: HEERAPUR RAIYAT
Work Code: 1725007034/WC/22012034920828 (stopdem jirnodhar kar salakram ke baade ke pas)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2021 Work start date : 3/3/2022
Present status : Existing Proposed Status : Repair & Maint of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 728kj Sanction Date : 17/1/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost MGNEGA scheme2 scheme3 Total
211000 326000 0 0 0 0 0 326000 0 537000
Financial Sanction Details
Financial\Administrative Sanction No: 1144li Financial\Administrative Sanction Date 24/2/2022
Fin. Sanc. Amt. (in Rs) NREGA:537000 MGNEGA
0
Scheme 2
0
Scheme 3
0
Total
537000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.1206.64796.8
2Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)72.63317.7623078.9088
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)85.4553175.78271386.2799
4False work for R.C.C. and P.C.C. work in plinth and foundation13517223220
5Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height36074.7626913.6
6Transportation of metal 75.2174.8913151.728
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.51.61289.3714934.3857
8Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)1080148.33160196.4
9work charge13321.93321.9
Total Activity 537000
S.NoMaterialQuantityUnit PriceTotal
140 M.M. METAL52575.239480
2CEMENT (Beg)551125137775
3Centring & Shuttering17213523220
4CONTANGANCY6298.916298.9
5Display board140004000
6Mason Payment (Semi Skilled)3684516560
7mixer Mashin8853026550
8Sand1076.254245202.5
9लोहा74.7636026913.6
Total Material 326000