Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 11:44:47 PM 
Back  
State: MAHARASHTRA District: BULDHANA Block: MOTALA Panchayat: AVHA
Work Code: 1822002105/WC/1234859340 (PSP सार्वजनिक शोषखड्डा क्र.3 ग्रा.पं. आव्हा सन २०२२-२३ )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat (3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 20/6/2022 Work start date : 30/6/2022
Present status : Non-existent Proposed Status : Construction of Mini Percolation Tank for Comm
Tech Sanction Details
Technical Sanction No. : 1822002/2022-2023/163020/TS Sanction Date : 20/6/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
12989.49 5360 0 0 0 0 0 5400 0 18349.49
Financial Sanction Details
Financial\Administrative Sanction No: 1822002/2022-2023/163020/AS Financial\Administrative Sanction Date 20/6/2022
Fin. Sanc. Amt. (in Rs) NREGA:18349 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
18400
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Excavation in earth for all sorts of soil & silt, lime, shadu, sand/ grit, such types of strata including dressing and conveying the excavated material by head and upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto lift of 1:50m as directed. (A) Excavation - (In General) Rate for the area5.4108.8587.52
2Excavation in earth for soft murum type of strata including dressing and converying the excavated material by head load upto a distance of 10m and laying or spereading or filling in furrahas in layers of 30cm. Thick upto a lift of 1.50m as directed. (A) Excavation - (In General) rate for the othe area5.4137.216666666667740.97
3Collecting large size stone/boulders available at stone quarry site or road side and excavating the same if required from ground and collecting the (without blasting), preparing 40mm to 60 mm size metal from it and stacking the same on ground or filling furrah. For other area.10.8598.5277777777786464.1
4Conveying metal of all sizes from stacks, spreading/laying and sectioning/dressing est. doing all such works. For other area.10.854.5277777777778588.9
5Man days for unskilled182564608
6Lum sum Material for all works.300013000
Total Activity 16000
S.NoMaterialQuantityUnit PriceTotal
13-Display Board120002000
25-GST1360360
3MR6533-Material cost Rs 1/- per unit.300013000
Total Material 5400