S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 12140 | 12140 |
3 | Work charge | 1 | 41000 | 41000 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 491.8 | 70.8 | 34819.44 |
5 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 944.5 | 63.1 | 59597.95 |
6 | TRANSPORTATION OF MATERIAL | 436.8 | 176.87 | 77256.816 |
7 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 436.8 | 382.8 | 167207.04 |
8 | Site clearance, cutting grass, raking into heaps and removing off the premises | 900 | 1.8 | 1620 |
9 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 436.8 | 100.3 | 43811.04 |