Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:22:50 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SUNWAHA
Work Code: 1711003056/WC/9993657513 (gabion structure mukti dham ke pass )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2015 Work start date : 1/9/2015
Present status : Non-existent Proposed Status : Gabions
Tech Sanction Details
Technical Sanction No. : 125/sun Sanction Date : 4/9/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
288000 152000 0 0 0 0 0 152000 0 440000
Financial Sanction Details
Financial\Administrative Sanction No: 18/sun Financial\Administrative Sanction Date 4/9/2015
Fin. Sanc. Amt. (in Rs) NREGA:440000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
440000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency11214012140
3Work charge14100041000
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil491.870.834819.44
5Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.944.563.159597.95
6TRANSPORTATION OF MATERIAL436.8176.8777256.816
7FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders436.8382.8167207.04
8Site clearance, cutting grass, raking into heaps and removing off the premises9001.81620
9Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.436.8100.343811.04
Total Activity 440000
S.NoMaterialQuantityUnit PriceTotal
1Binding wire708.287049579.6
2CONTENGENCY11200012000
3Transpotation Charges328.8273.5889953.104
Total Material 152000