S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1912.5 | 6.54194509803922 | 12511.47 |
2 | (a) Other then black trap Basalt or granite | 189.6 | 298.858438818565 | 56663.56 |
3 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 3590.2 | 2.35125341206618 | 8441.47 |
4 | (XI) 6 Km. Lead | 189.6 | 261.068723628692 | 49498.63 |
5 | (III) 1.5 Km. Lead | 1137.5 | 77.5286153846154 | 88188.8 |
6 | (XIV) 9 Km. Lead | 2112.5 | 199.264118343195 | 420945.45 |
7 | (XV) 10 Km. Lead | 170.1 | 209.742210464433 | 35677.15 |
8 | (a) Boulders | 100.5 | 570.825174129353 | 57367.93 |
9 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 170.1 | 421.80911228689 | 71749.73 |
10 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 3420.1 | 21.746533727084 | 74375.32 |
11 | a (iii) Loose or soft soil for Tank Work | 77.63 | 99.3997166044055 | 7716.4 |
12 | b (iii) Dense or hard soil for Tank Work | 1137.5 | 134.187498901099 | 152638.28 |
13 | c (iii) Hard moorum for Tank Work | 2212.4 | 178.737750858796 | 395439.4 |
14 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 108.68 | 568.921972764078 | 61830.44 |