S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 252 | 156.78 | 39508.56 |
2 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 42 | 1414.64 | 59414.88 |
3 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 12 | 3947.45 | 47369.4 |
4 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 120 | 2732.88 | 327945.6 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 300 | 192.97 | 57891 |
6 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 0 | 0 | 0 |
7 | Transportation of metal | 42 | 261.71 | 10991.82 |
8 | Transportation of metal | 10.2 | 237.87 | 2426.274 |
9 | Transportation of sand | 78.3 | 293.59 | 22988.097 |
10 | Transportation rates for Masonry stone. | 120 | 357.53 | 42903.6 |
11 | SIGN BOARD | 1 | 3560.76 | 3560.76 |