S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 85 | 6.64529411764706 | 564.85 |
2 | (XI) 6 Km. Lead | 52 | 262.241346153846 | 13636.55 |
3 | Providing and construction for retaining earth etc. with segments of wire crates of size 7mx3mx0.6m each divided into 1.5m compartments by cross netting, made from 4mm galvanised steel wire@32kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100x100mm, filled with boulders with least dimension of 200mm, all loose ends to be tied with 4mm galvanised steel wire | 52 | 812.841153846154 | 42267.74 |
4 | (c) Hard moorum | 29 | 164.221724137931 | 4762.43 |
5 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 52 | 163.5675 | 8505.51 |