The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:20:51 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: GOARKALAN
Work Code: 1702001025/RC/22012034208315 (C.C.Road Pipari aam rasta se ujagar singh ke makan)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 24/1/2014 Work start date : 25/2/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 189/2013-14 Sanction Date : 10/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
125400 83600 0 0 458000 0 0 542000 0 667000
Financial Sanction Details
Financial\Administrative Sanction No: 05/189/2013-14 Financial\Administrative Sanction Date 12/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:209000 Panchparmeshwar
458000
Scheme 2
0
Scheme 3
0
Total
667000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Single spade stroke minimum 75mm deep8370.5418.5
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.128.061504.864645.1928
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)128.0612928.1374975.4141
5False work for R.C.C. and P.C.C. work in plinth and foundation158.193127.320137.9689
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)496.626.13029.382
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 14865.764865.76
8Transportation of 20 MM metal108.85657.1871534.043
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.185874.785874.7
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.128.06181.210398.5532
11contingency128550.5128550.51
Total Activity 667000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)27830083400
2Convergence Amount1458000458000
Total Material 542000