State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KADHURA
Work Code: 1702001047/WC/22012034544971 (Naveen Talab Nirman- Shantidham, Kadora)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2020 Work start date : 1/5/2020
Present status : Non-existent Proposed Status : Constr of Water Absorption Trench Trench for Comm
Tech Sanction Details
Technical Sanction No. : 1702001/2020-2021/135814/TS Sanction Date : 22/5/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
597975.38 377829.74 1686.34 40159.27 0 0 0 420000 0 1017650.73
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2020-2021/135814/AS Financial\Administrative Sanction Date 22/5/2020
Fin. Sanc. Amt. (in Rs) NREGA:1017651 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1018000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.25006.54194816354.87
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)88.293159.36867142372278940.66
3Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column130.2156.78102918586820412.89
4False work for R.C.C. and P.C.C. work in plinth and foundation.101.4164.45059171597616675.29
522cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.450202.21351111111190996.08
6(a) Other then black trap Basalt or granite190297.11826315789556452.47
7(b) Dense or hard soil3682.98146.027540198426537816.51
Total Activity 1018000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper8.8298857813.665
20367-Portland Cement19.42385511107044.5618
30983-Fine sand (zone IV)41.49631076.2544660.392875
47753-Boulder 50 mm to 200 mm13514719845
5MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT57.388552530128.9625
6MR6034-Blaster (Semi-Skilled)1.9329625.1
7MR6035-Gelatine (80%)36.165.62368.16
8MR6036-Electric detonator19016.43116
9MR6037-Fuse coil (10m long)578.2467.4
10MR6038-Drilling of holes 25mm dia 0.75m deep142.561.518765.175
11MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)21.189668214451.3072
12MR6091-WOOD-Kail wood 2nd class0.845315825.613377.37968
Total Material 253000