Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:09:01 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: LASUDLYAJAGMAL
Work Code: 1719006027/RC/22012034200457 (cc road pp nrega gangaram to anokhi pipliya nolaya)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 20/1/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 027/01 Sanction Date : 24/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
82900 54900 0 0 300000 0 0 355000 0 437800
Financial Sanction Details
Financial\Administrative Sanction No: 27/01 Financial\Administrative Sanction Date 2/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:137800 Panchparmeshwar
300000
Scheme 2
0
Scheme 3
0
Total
438000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)111.12442.8271395.08
2Labour only for item no. 0413 (for any proportion of cement concrete)111.1392.243573.42
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used111.1132.114676.31
4False work for R.C.C. and P.C.C. work in plinth and foundation159153.124342.9
5Deduct for concrete unvibrated in item no. 042596.115614991.6
6Cutting out cracked of roof terrace to V-Section, cleaning out and filling solidly with a hot mixture of bitumen and clean dry sand slurry 1:1 (1 by weight)100
7Transportation of metal 114.4863.547274.0592
8Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.50189.369468
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.97.77210.420570.808
10Loading of metal in truck, dumper etc.114.4826.283008.5344
11Unloading of metal in truck, dumper etc.114.4813.141504.2672
12Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.114.48414693.68
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work115.581.29378.6
14Collection of hard moorum including stacking at quarry.114.48112.812913.344
Total Activity 438000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL97.7790087993
2CEMENT(BEGS)685280191800
3Centring & Shuttering15995.715216.3
4contangency and work charges120002000
5Mason (semi skilled)122002400
6sand cum5070035000
7Transportanion of hard Muram114.4863.547274.0592
8Vibrator (Per Day)2260013200
Total Material 355000