Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 07:05:59 PM 
Back  
State: MADHYA PRADESH District: REWA Block: NAIGARHI Panchayat: BELAHA NAGAKAR
Work Code: 1713007046/WC/22012034852030 (rain water harwesting ms belha kothar)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/4/2021 Work start date : 13/10/2021
Present status : Non-existent Proposed Status : Roof top rain wat. har. str. in gov/panchayat bldg
Tech Sanction Details
Technical Sanction No. : 46/253 Sanction Date : 29/5/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
4650 0 0 0 26350 0 0 26400 0 31000
Financial Sanction Details
Financial\Administrative Sanction No: 046/3 Financial\Administrative Sanction Date 5/9/2021
Fin. Sanc. Amt. (in Rs) NREGA:4650 Panchparmeshwar
26350
Scheme 2
0
Scheme 3
0
Total
31000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Work charge142004200
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil27148.334004.91
3Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)0.743873.852866.649
4Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:30.4530.39212.156
5Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:44530.292121.16
615mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand)20.96139.842931.0464
7Collection of quarried stone or rubble.-Size 0.014 cum to 0.066.75185.371251.2475
8Transportation of metal 20.59159.753289.2525
9Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.0.72158.99114.4728
10Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.13.5151.882050.38
11Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.6.75111.74754.245
12Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.13.5163.562208.06
13Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.6.75288.121944.81
14SIGN BOARD130003000
Total Activity 31000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount12635026350
Total Material 26400