S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1912.5 | 7.02398431372549 | 13433.37 |
2 | Providing stone chips under stone pitching | 540 | 457.812722222222 | 247218.87 |
3 | (a) Other then black trap Basalt or granite | 321.3 | 313.729256146903 | 100801.21 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 2843.1 | 2.52450142450142 | 7177.41 |
5 | (III) 1.5 Km. Lead | 1105.65 | 106.655478677701 | 117923.63 |
6 | (VIII) 4.0 Km. Lead | 1737.45 | 142.001864801865 | 246721.14 |
7 | (a) Boulders | 168.75 | 598.843496296296 | 101054.84 |
8 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 170.1 | 452.889770723104 | 77036.55 |
9 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 2843.1 | 21.9341669304632 | 62361.03 |
10 | b (iii) Dense or hard soil for Tank Work | 982.8 | 144.075 | 141596.91 |
11 | c (iii) Hard moorum for Tank Work | 1780.65 | 191.907898801 | 341720.8 |
12 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 51.57 | 609.846422338569 | 31449.78 |
13 | b (i) Hard rock requiring blasting for Tank Work | 13.86 | 632.743145743146 | 8769.82 |