Work Code: 1830001198/IF/1235873413 (JSV सिचंन विहीर रामचंद्र तरकडु नैताम ग्रा.प. खरपुंडी)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat (3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 27/12/2023 Work start date : 1/1/2024
Present status : Not Exist Proposed Status : Constr of Irrigation Open Well for Individuals
Tech Sanction Details
Technical Sanction No. : 1830001/2023-2024/155508/TS Sanction Date : 1/3/2024
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
198987.54 191482.76 5121.57 4408.45 0 0 0 202000 0 400000.32
Financial Sanction Details
Financial\Administrative Sanction No: 1830001/2023-2024/155508/AS Financial\Administrative Sanction Date 1/3/2024
Fin. Sanc. Amt. (in Rs) NREGA:400000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
400000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Excavation in earth for all sorts of soil & silt, lime, shadu, sand/ grit, such types of strata including dressing and conveying the excavated material by head and upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto lift of 1:50m as directed. (C) Excavation for well- Rate tribal janjati115.454166.80296914788619258.07
2Excavation in earth for hard murum containing boulders upto size of 0.1 cum type of strata, including dressing and converying the excavaed material by headload upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cum. thick upto lift of 1.50m as directed. (B) Excavation for well- Rate99.55340.43103967855433889.91
3Exavation in hard man type of strata including dressing and canveying the excavated material by head load upto a distance of 10m and laying or spreading or fillinf in furrahas in layers of 30cm. Thick upto lift of 1.50m as directed. (B) Excavation for well- Rate tribal janjati84.824523.88698953126544438.19
4Excavation in soft rock type of strata including dressing and conveying the excavated material by head load upto a distance of 10m and laying or spreading or filling in furreahas in layers of 30cm. Thick upto lift of 1.50m as directed. (B) Excavation for well- Rate tribal Janjati26.578653.83512679659917377.63
5Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock. (Additional lead of 10 m. in tribal / hilly area)268.67930.95820663319438317.82
6Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift of 1.5 m in tribal / hilly area.57.72775.89394910527144381.13
7Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift up to 3.00 m in tribal / hilly area.49.775109.25435.43
8Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift up to 4.50 m in tribal / hilly area.49.775156.9285786037177811.12
9Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift up to 6.00 m in tribal / hilly area.42.412204.8700839385088688.95
10Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift up to 7.50 m in tribal / hilly area.42.412251.95180609261510685.78
11Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift up to 9.00 m for tribal/Hilly area26.578299.8630446233737969.76
12Providing and laying in situ / ready mix / ready mix M20 RCC work with trap/ granite/ quartzite/ gneiss metal in well steining including shuttering, compacting by vibrating, finishing and curing etc. complete. (fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural/artifical sand, excluding reinforcement)15.6878379.22292343979131444.87
13Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 3.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary)90172.29233333333315506.31
14Backfilling the trenches in layers not exceeding 300 mm, each layer shall be consolidated by watering and ramming without disturbing the pipe line with excavated stuff as directed including breaking of clods of soil etc complete. (The backfilling on the two sides of the pipeline should be carried out simultaneously)175.50991.33007424120716029.25
15Cutting, bending, hooking, laying in position and tying M.S./HYSD/TMT bars for reinforcement of R.C.C. work as per detailed drawing etc. complete.0.51874614.227799227838650.17
Total Activity 370000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper15.6874707372.89
20011-Hire charges of Pump set of capacity 4000 litres/hour13.577610476
30012-Vibrator (Needle type 40 mm)15.6871352.3221213.84384
40295-Stone Aggregate(single size):20 mm nominal size9.412210509882.81
50296-Stone Aggregate(single size): 12.5 mm nominal size4.706110504941.405
60367-Portland Cement5.17671600031060.26
70982-Coarse sand (zone III)7.05915160011294.64
83-Display Board / CIB110001000
95-GST12911629116
107335-Binding wire5.1874383.32
11MR6206-steel TMT FE 5000.5186100031598
12MR6207-shuttering(centaring)39.2175583.8522897.137375
13MR6325-water156870.213294.27
Total Material 185000